Loading permits…
Pick your trade and area. Switch to ⏱ Ready now to see the jobs at the stage you’re needed.
Loading permits…
Switch to Ready now to see jobs timed for your trade.
Neighbourhoods are free. Full addresses are for members.
Permits from the last 9 months show the neighbourhood only. Members get every address, the Ready-now timing for their trade, saved leads and a morning email — $99/month, and if you don’t land a job in 30 days, we refund you.
Updated daily from city open data · 24 addresses locked on this page
Toronto · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: New laneway/garden suite — the rear yard gets rebuilt
Proposal to construct a new two-storey garden suite.See also 23-168424 ZAP 00 ZR and…
Toronto · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: New home — builders usually stop at sod
Proposal to construct 2 storey SFD with attached garage, finished basement and walkout
Toronto · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: Construction access wrecks the yard
Propose to legalize one storey rear addition, front porch stairs, creation of two unit…
Toronto · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: New laneway/garden suite — the rear yard gets rebuilt
Proposal for a 1 storey garden suite
Toronto · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: Construction access wrecks the yard
Proposed addition to the rear side of the existing dwelling and convert into a triplex.
Toronto · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: Construction access wrecks the yard
Proposed addition of a door, ceiling lighting, drain and wall hydrant to the garbage room…
Toronto · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: Pool installs leave the yard torn up
Proposal to construct a two-level rear addition to the existing dwelling, including a…
Toronto · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: Construction access wrecks the yard
Proposed new two storey rear addition, interior alteration and underpinning of existing…
Toronto · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: Construction access wrecks the yard
Proposed demolition and construction of interior partitions and ceilings, creation of new…
Toronto · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: New laneway/garden suite — the rear yard gets rebuilt
Proposal to demolish existing garage and construct a new two-storey garden suite.See alsi…
Toronto · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: Construction access wrecks the yard
Proposed 3rd floor addition to an existing two storey semi detached with a rear balcony
Vaughan · Issued Oct 27, 2026 · 9 days ago
Why it’s a lead: New home — builders usually stop at sod
New Subdivision home EP-26 120181 finished basement=284.58 m2 first floor=286.31…
Brampton · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: Construction access wrecks the yard
Single Family Detached: Addition - Complete
Burlington · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: Construction access wrecks the yard
Single Detached Dwelling: Addition
Burlington · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: Construction access wrecks the yard
Single Detached Dwelling: Addition
Burlington · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: Construction access wrecks the yard
Single Detached Dwelling: Addition
Kitchener · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New home — builders usually stop at sod
A new The Wellesley Corner NTHF rowhouse unit. (Block 3 - Lot 14/elevation CR)
Kitchener · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New home — builders usually stop at sod
A new The Berlin NTHA rowhouse unit. (Block 3 - Lot 15/elevation CR)
Kitchener · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New home — builders usually stop at sod
A new The Cranbrook NTHB rowhouse unit. (Block 3 - Lot 16/elevation CR)
Kitchener · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New home — builders usually stop at sod
A new The Berlin NTHA rowhouse unit. (Block 3 - Lot 17/elevation CR)
Kitchener · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New home — builders usually stop at sod
A new The Millbank End NTHC rowhouse unit. (Block 3 - Lot 18/elevation CR)
Kitchener · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: Construction access wrecks the yard
A porch at the single detached dwelling
Mississauga · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: Construction access wrecks the yard
(1) storey rear add. W/ increase in building height front & rear porches int. Alts.…
Toronto · Issued Oct 26, 2026 · 10 days ago
Why it’s a lead: New laneway/garden suite — the rear yard gets rebuilt
Proposal to construct a two storey laneway suite in the rear yard. See related ZAP Folder…