Loading permits…
Pick your trade and area. Switch to ⏱ Ready now to see the jobs at the stage you’re needed.
Want repeat work? See the builders pulling the most permits →
Loading permits…
Switch to Ready now to see jobs timed for your trade.
Neighbourhoods are free. Full addresses are for members.
Permits from the last 9 months show the neighbourhood only. Members get every address, the Ready-now timing for their trade, saved leads and a morning email — $99/month, and if you don’t land a job in 30 days, we refund you.
Updated daily from city open data · 24 addresses locked on this page
Kitchener · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
A new Dundee D30C single detached dwelling with an attached garage. (elevation MK)
Kitchener · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: Roof, dormer or storey addition
A 27' x 17' gazebo at the rear of a single detached dwelling
Mississauga · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: Roof, dormer or storey addition
2nd storey heated addition above garage
Toronto · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Proposal to construct a new two storey Garden Suite.(applicant will be submitting revised…
Toronto · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: Additions tie into the existing roof
Proposal for rear addition on second floor.
Toronto · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: Additions tie into the existing roof
Proposed two storey addition in rear yard
Toronto · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: Roof, dormer or storey addition
Proposed roof repairs to existing wood deck, guards and pergola on the roof and rear 3rd…
Toronto · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: Additions tie into the existing roof
Proposed rear one storey addition and rear deck
Toronto · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
NEW 3-STOREY DETACHED SFD WITH INTEGRAL GARAGE (22.74 SQM) AND FINISHED BASEMENT…
Toronto · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: Additions tie into the existing roof
Proposal for a rear 2 storey addition and interior alterations
Toronto · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Proposed a new two-storey detached ancillary building containing a two-unit laneway suite…
Toronto · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: Roof, dormer or storey addition
Proposal for interior alteration to existing dwelling, second storey addition, removal of…
Toronto · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: Roof, dormer or storey addition
Removing of interior wall and installation of new LVL. Renovation of porch roof.
Vaughan · Issued Oct 13, 2026 · 24 days ago
Why it’s a lead: Additions tie into the existing roof
Addition of Sunroom on rear side of the building
Oakville · Issued Oct 10, 2026 · 27 days ago
Why it’s a lead: Additions tie into the existing roof
Proposed attached Garage addition and front covered porch
Oakville · Issued Oct 10, 2026 · 27 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Blk 18-92. Lot Specific: model A1802 Aspen-Ele B2, 3 storey standard common element…
Oakville · Issued Oct 10, 2026 · 27 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Blk 18-93, model A1700 Glen Abbey - elev. A1, A2, B1 & B2: 3 storey stand common…
Oakville · Issued Oct 10, 2026 · 27 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Blk 18-94, REPEAT of model A1700 Glen Abbey (26-020453) elev. A1, A2, B1 &B2: 3…
Oakville · Issued Oct 10, 2026 · 27 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Blk 18-95, model A1802 Aspen - elev. A1, A2, B1 & B2: 3 storey standard common…
Oakville · Issued Oct 10, 2026 · 27 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Blk 18-96, REPEAT of model A1802 Aspen (26-020448) elev. 'A1'-End,…
Oakville · Issued Oct 10, 2026 · 27 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Lot 48. REPEAT of model O28-3 (25-125896), Elev B. Construction of a 2 storey single…
Oakville · Issued Oct 10, 2026 · 27 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
LOT 42. REPEAT OF Model O36-1 Elev A (25-123387) Construction of a 5-bedroom standard…
Oakville · Issued Oct 10, 2026 · 27 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
LOT 10. REPEAT OF Model O36-5 Elev A (25-125900) Construction of a 4-bedroom standard…
Oakville · Issued Oct 10, 2026 · 27 days ago
Why it’s a lead: Additions tie into the existing roof
Revision to permit including new stair layout. Basement level: new concrete footing under…