Loading permits…
Pick your trade and area. Switch to ⏱ Ready now to see the jobs at the stage you’re needed.
Want repeat work? See the builders pulling the most permits →
Loading permits…
Switch to Ready now to see jobs timed for your trade.
Neighbourhoods are free. Full addresses are for members.
Permits from the last 9 months show the neighbourhood only. Members get every address, the Ready-now timing for their trade, saved leads and a morning email — $99/month, and if you don’t land a job in 30 days, we refund you.
Updated daily from city open data · 24 addresses locked on this page
Oakville · Issued Oct 15, 2026 · 21 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Blk 16-108, REPEAT of model A1700 Glen Abbey (26-020453) elev. A2: 3 storey standard…
Oakville · Issued Oct 15, 2026 · 21 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Blk 16-109, REPEAT of model A1700 Glen Abbey (26-020453) elev. A1: 3 storey standard…
Oakville · Issued Oct 15, 2026 · 21 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Blk 16-110, REPEAT of model A1700 Glen Abbey (26-020453) elev. A2: 3 storey standard…
Oakville · Issued Oct 15, 2026 · 21 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Blk 16-111, REPEAT of model A1802 Aspen (26-020455) elev. 'A2': 3 storey…
Oakville · Issued Oct 15, 2026 · 21 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Blk 16-112, model A1802 Aspen - elev. 'C1'-Corner: 3 storey stand. common…
Toronto · Issued Oct 15, 2026 · 21 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Proposed New 2 storey Garden suite with integrated three car garage.(see 26 180570 BLD…
Toronto · Issued Oct 15, 2026 · 21 days ago
Why it’s a lead: Roof, dormer or storey addition
Two Storey Addition+Second Storey Addition+Interior Alteration+Second…
Toronto · Issued Oct 15, 2026 · 21 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
PART 1 - Proposal for a new two-storey single detached dwelling with integral garage,…
Toronto · Issued Oct 15, 2026 · 21 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Proposed demolish existing dwelling and construct new 3 storey four unit (fourplex)…
Toronto · Issued Oct 15, 2026 · 21 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Ancillary residential unit (Garden House)
Toronto · Issued Oct 15, 2026 · 21 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Proposed 1-stoprey rear yard ADU (Garden Suite)See also 26 165303 ZAP
Toronto · Issued Oct 15, 2026 · 21 days ago
Why it’s a lead: Additions tie into the existing roof
Interior alteration on basement, ground and second floor and rear addition to ground…
Toronto · Issued Oct 15, 2026 · 21 days ago
Why it’s a lead: Roof, dormer or storey addition
Proposal for a second storey addition and interior alterations.
Toronto · Issued Oct 15, 2026 · 21 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Proposed demolition of an existing house and build new fourplex dwelling with same…
Toronto · Issued Oct 15, 2026 · 21 days ago
Why it’s a lead: Additions tie into the existing roof
Proposal to construct an addition to the existing Residential Home
Toronto · Issued Oct 15, 2026 · 21 days ago
Why it’s a lead: Roof, dormer or storey addition
Tree impact damage repairs to the roof
Toronto · Issued Oct 15, 2026 · 21 days ago
Why it’s a lead: Additions tie into the existing roof
Proposal to convert existing rear sun room to living space, connecting to the existing…
Toronto · Issued Oct 15, 2026 · 21 days ago
Why it’s a lead: Additions tie into the existing roof
Proposal for interior alterations as well as 2nd floor, front, rear and garage…
Toronto · Issued Oct 15, 2026 · 21 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Proposal to demolish existing SFD and construct a new 2-unit, 2-storey dwelling with…
Toronto · Issued Oct 15, 2026 · 21 days ago
Why it’s a lead: Additions tie into the existing roof
Proposed new two storey rear addition, interior alterations, new finished basement,…
Toronto · Issued Oct 15, 2026 · 21 days ago
Why it’s a lead: Roof, dormer or storey addition
Proposal of new roof on existing deck in rear yard.
Waterloo · Issued Oct 15, 2026 · 21 days ago
Why it’s a lead: Roof, dormer or storey addition
New roof over existing rear yard deck.
Burlington · Issued Oct 14, 2026 · 22 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Single Detached Dwelling: New
Burlington · Issued Oct 14, 2026 · 22 days ago
Why it’s a lead: Additions tie into the existing roof
Single Detached Dwelling: Addition