Loading permits…
Pick your trade and area. Switch to ⏱ Ready now to see the jobs at the stage you’re needed.
Loading permits…
Switch to Ready now to see jobs timed for your trade.
Neighbourhoods are free. Full addresses are for members.
Permits from the last 9 months show the neighbourhood only. Members get every address, the Ready-now timing for their trade, saved leads and a morning email — $99/month, and if you don’t land a job in 30 days, we refund you.
Updated daily from city open data · 24 addresses locked on this page
Mississauga · Issued Oct 13, 2026 · 23 days ago
Why it’s a lead: Construction access wrecks the yard
2nd storey heated addition above garage
Toronto · Issued Oct 13, 2026 · 23 days ago
Why it’s a lead: New laneway/garden suite — the rear yard gets rebuilt
Proposal to construct a new two storey Garden Suite.(applicant will be submitting revised…
Toronto · Issued Oct 13, 2026 · 23 days ago
Why it’s a lead: Construction access wrecks the yard
Proposal for rear addition on second floor.
Toronto · Issued Oct 13, 2026 · 23 days ago
Why it’s a lead: Construction access wrecks the yard
Proposed two storey addition in rear yard
Toronto · Issued Oct 13, 2026 · 23 days ago
Why it’s a lead: Construction access wrecks the yard
Proposed rear one storey addition and rear deck
Toronto · Issued Oct 13, 2026 · 23 days ago
Why it’s a lead: New home — builders usually stop at sod
NEW 3-STOREY DETACHED SFD WITH INTEGRAL GARAGE (22.74 SQM) AND FINISHED BASEMENT…
Toronto · Issued Oct 13, 2026 · 23 days ago
Why it’s a lead: Construction access wrecks the yard
Proposal for a rear 2 storey addition and interior alterations
Toronto · Issued Oct 13, 2026 · 23 days ago
Why it’s a lead: New laneway/garden suite — the rear yard gets rebuilt
Proposed a new two-storey detached ancillary building containing a two-unit laneway suite…
Toronto · Issued Oct 13, 2026 · 23 days ago
Why it’s a lead: Construction access wrecks the yard
Proposal for interior alteration to existing dwelling, second storey addition, removal of…
Vaughan · Issued Oct 13, 2026 · 23 days ago
Why it’s a lead: Construction access wrecks the yard
Addition of Sunroom on rear side of the building
Oakville · Issued Oct 10, 2026 · 26 days ago
Why it’s a lead: New home — builders usually stop at sod
LOT 10. REPEAT OF Model O36-5 Elev A (25-125900) Construction of a 4-bedroom standard…
Cambridge · Issued Oct 9, 2026 · 27 days ago
Why it’s a lead: New home — builders usually stop at sod
Residential Building: Single Detached, new
Kitchener · Issued Oct 9, 2026 · 27 days ago
Why it’s a lead: Construction access wrecks the yard
Replacement of a deck without stairs in the rear yard of a duplex dwelling
Kitchener · Issued Oct 9, 2026 · 27 days ago
Why it’s a lead: New home — builders usually stop at sod
2 storey single detached dwelling, no deck included, finished basement w/ 3pc bath, no A/C
Mississauga · Issued Oct 9, 2026 · 27 days ago
Why it’s a lead: New home — builders usually stop at sod
New detached garage in rear yard
Toronto · Issued Oct 9, 2026 · 27 days ago
Why it’s a lead: Construction access wrecks the yard
PROPOSED SECOND-STOREY ADDITION OVER THE EXISTING CARPORT AND STORAGE AREA, CONVERSION OF…
Toronto · Issued Oct 9, 2026 · 27 days ago
Why it’s a lead: New laneway/garden suite — the rear yard gets rebuilt
Proposed Garden suite
Toronto · Issued Oct 9, 2026 · 27 days ago
Why it’s a lead: Construction access wrecks the yard
Small third floor addition above existing roof deck. Work to include new washroom on…
Toronto · Issued Oct 9, 2026 · 27 days ago
Why it’s a lead: Construction access wrecks the yard
RENOVATION AND ADDITION TO CREATE A 3-STOREY DETACHED HOUSEPLEX WITH 5 DWELLING UNITS.
Toronto · Issued Oct 9, 2026 · 27 days ago
Why it’s a lead: Construction access wrecks the yard
Proposal for a one storey side garage addition and one storey front addition.
Toronto · Issued Oct 9, 2026 · 27 days ago
Why it’s a lead: Construction access wrecks the yard
Addition of new basement window and window well
Kitchener · Issued Oct 8, 2026 · 28 days ago
Why it’s a lead: New home — builders usually stop at sod
A new Olivia rowhouse with an attached garage. (Block D - Unit 19)
Kitchener · Issued Oct 8, 2026 · 28 days ago
Why it’s a lead: New home — builders usually stop at sod
A new Bodhi rowhouse with an attached garage. (Block D - Unit 20)
Kitchener · Issued Oct 8, 2026 · 28 days ago
Why it’s a lead: New home — builders usually stop at sod
A new Bodhi rowhouse with an attached garage. (Block D - Unit 21)