Loading permits…
Pick your trade and area. Switch to ⏱ Ready now to see the jobs at the stage you’re needed.
Loading permits…
Switch to Ready now to see jobs timed for your trade.
Neighbourhoods are free. Full addresses are for members.
Permits from the last 9 months show the neighbourhood only. Members get every address, the Ready-now timing for their trade, saved leads and a morning email — $99/month, and if you don’t land a job in 30 days, we refund you.
Updated daily from city open data · 24 addresses locked on this page
Toronto · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: Additions add new windows
Proposed rear addition to existing house (unheated)
Toronto · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: Additions add new windows
Proposal to construct a 1-storey rear addition to an existing semi-detached SFD. Work…
Toronto · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: Additions add new windows
Proposed to alter the existing single family home by constructing a one storey rear…
Toronto · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: Nobody moves into a new home with bare windows
Proposal to demo existing building to construct a new 3 storey fourplex.
Toronto · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: Additions add new windows
Major renovation of an existing Triplex building. The work includes addition to the rear,…
Toronto · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: Nobody moves into a new home with bare windows
Proposed construction of a new 2-story detached Garden Suite in the Rear yard.(See 26…
Toronto · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: Nobody moves into a new home with bare windows
Scope includes removing existing fire damaged frame/above grade structure and exterior…
Toronto · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: Nobody moves into a new home with bare windows
Proposed Garden suite
Toronto · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: Nobody moves into a new home with bare windows
Proposal to demolish existing garage in the rear yard and construct a new two-storey…
Toronto · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: Nobody moves into a new home with bare windows
Proposed garden suite.
Toronto · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: Nobody moves into a new home with bare windows
Proposed garden suite.
Toronto · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: Nobody moves into a new home with bare windows
Proposed new garden suite in the rear yard
Toronto · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: Additions add new windows
Proposal to convert a lawfully existing carport to an attached garage. Rear & side walls…
Toronto · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: Nobody moves into a new home with bare windows
Proposed Garden suiteConvenience address is 527 Warden Ave.
Toronto · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: Nobody moves into a new home with bare windows
Proposal for fourplex
Toronto · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: Additions add new windows
Proposed 3rd storey addition, front one-storey addition, rear two-storey addition, a…
Toronto · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: Additions add new windows
Proposal for ground floor and second floor additions with interior alterations.
Toronto · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: Additions add new windows
Proposal for a 2 storey rear addition, interior alterations, basement walk out and a rear…
Toronto · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: Additions add new windows
Proposal to replace existing sloped roof with a flat roof on existing house.
Toronto · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: Additions add new windows
proposed renovation, rear addition (with basement) with rear deck and stairs, and…
Toronto · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: Nobody moves into a new home with bare windows
Proposal to construct a new one-storey semi-detached garage (23.41sqm)
Waterloo · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: Nobody moves into a new home with bare windows
TEST FOR DCS
Kitchener · Issued Oct 19, 2026 · 17 days ago
Why it’s a lead: Nobody moves into a new home with bare windows
A new 12-unit rental stacked rowhouse development (Block A) with an alternative solution.
Kitchener · Issued Oct 19, 2026 · 17 days ago
Why it’s a lead: Additions add new windows
Construction of an uncovered deck next to the existing porch on the front yard of a…