Loading permits…
Pick your trade and area. Switch to ⏱ Ready now to see the jobs at the stage you’re needed.
Loading permits…
Switch to Ready now to see jobs timed for your trade.
Neighbourhoods are free. Full addresses are for members.
Permits from the last 9 months show the neighbourhood only. Members get every address, the Ready-now timing for their trade, saved leads and a morning email — $99/month, and if you don’t land a job in 30 days, we refund you.
Updated daily from city open data · 24 addresses locked on this page
Kitchener · Issued Oct 21, 2026 · 15 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
A new Dundee D30C single detached dwelling with an attached garage and finished basement.…
Kitchener · Issued Oct 21, 2026 · 15 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
A new Brooksdale D36A single detached dwelling with an attached garage. (Elevation CR)
Kitchener · Issued Oct 21, 2026 · 15 days ago
Why it’s a lead: Additions tie into the existing roof
Permit is to remove and replace a second-floor deck with stairs in the rear yard of a…
Mississauga · Issued Oct 21, 2026 · 15 days ago
Why it’s a lead: Additions tie into the existing roof
New heated add. In rear yard & 2nd flr int alts on main & 2nd flr res 2nd unit in bsmt…
Toronto · Issued Oct 21, 2026 · 15 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Proposal to convert the existing one (1) storey detached garage into a new Garden…
Toronto · Issued Oct 21, 2026 · 15 days ago
Why it’s a lead: Roof, dormer or storey addition
proposed a duplex with rear, front , second and third storey addition with interior…
Toronto · Issued Oct 21, 2026 · 15 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Proposal to convert existing garage into a laneway suite
Toronto · Issued Oct 21, 2026 · 15 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Proposal to demolish the existing dwelling and construct a 2 storey 4-unit dwelling(see…
Toronto · Issued Oct 21, 2026 · 15 days ago
Why it’s a lead: Roof, dormer or storey addition
To alter the existing two-storey detached dwelling (containing one dwelling unit) by…
Toronto · Issued Oct 21, 2026 · 15 days ago
Why it’s a lead: Roof, dormer or storey addition
Proposal for underpinning, reinforce existing walls and add new foundations, walls,…
Toronto · Issued Oct 21, 2026 · 15 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Proposed new 2 storey garden suite
Toronto · Issued Oct 21, 2026 · 15 days ago
Why it’s a lead: Additions tie into the existing roof
Second floor room addition over the existing structure. House is a two-story,…
Toronto · Issued Oct 21, 2026 · 15 days ago
Why it’s a lead: Additions tie into the existing roof
Two-storey side addition, interior renovations to all floors, relocation of integral…
Toronto · Issued Oct 21, 2026 · 15 days ago
Why it’s a lead: Roof, dormer or storey addition
Renovate the existing one-and-one-half-storey detached dwelling by constructing a full…
Waterloo · Issued Oct 21, 2026 · 15 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
The Isaac Traditional - 2 storey single family dwelling. Unfinished basement with 3 piece…
Waterloo · Issued Oct 21, 2026 · 15 days ago
Why it’s a lead: Roof, dormer or storey addition
Installation of 252" x 143" louvered pergola
Brampton · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Single Family Detached: New Complete Building (3-storey, 11 bedrooms)
Cambridge · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Residential Building: Single Detached, new
Kitchener · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: Additions tie into the existing roof
Reconstruction of a sunroom on the rear of a single detached dwelling
Kitchener · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
A new Brooksdale D36A single detached dwelling with an attached garage. (Elevation TN)
Kitchener · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
A new Brooksdale D36A single detached dwelling with an attached garage. (elevation TN1)
Kitchener · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: Additions tie into the existing roof
A new 24' x 12' deck with stairs in the rear yard of a single detached dwelling
Mississauga · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Fire damage reconstruction of superstructure and basement bldg #12 - unit #13
Oakville · Issued Oct 20, 2026 · 16 days ago
Why it’s a lead: New build needs eavestroughs, gutters and roofing
Blk 87-08 Repeat model 2504 Corner (25-132422) Construction of a two storey townhouse…