Loading permits…
Pick your trade and area. Switch to ⏱ Ready now to see the jobs at the stage you’re needed.
Loading permits…
Permits at the stage when landscaping work usually starts.
Neighbourhoods are free. Full addresses are for members.
Permits from the last 9 months show the neighbourhood only. Members get every address, the Ready-now timing for their trade, saved leads and a morning email — $99/month, and if you don’t land a job in 30 days, we refund you.
Updated daily from city open data · 24 addresses locked on this page
Toronto · Issued Sep 4, 2026 · 2 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
REAR TWO-STOREY ADDITION (63.4 SQ.M) AND INTERIOR ALTERATION (21.8 SQ.M) TO THE EXISTING…
Toronto · Issued Sep 4, 2026 · 2 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
CONSTRUCTION OF A NEW SINGLE STOREY ADDITION IN THE REAR YARD ATTACHED TO THE MAIN…
Toronto · Issued Sep 4, 2026 · 2 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Proposal for 2 storey rear addition, interior alterations, and basement underpinning.
Kitchener · Issued Sep 3, 2026 · 2 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Replacement of a front porch at a single detached dwelling
Kitchener · Issued Sep 3, 2026 · 2 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
An uncovered ramp along the side of a single detached dwelling
Kitchener · Issued Sep 3, 2026 · 2 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Replacement of a deck at the rear of a rowhouse
Kitchener · Issued Sep 3, 2026 · 2 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Replacement of a deck in the rear yard at a rowhouse
Kitchener · Issued Sep 3, 2026 · 2 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Replacement of a deck at a rowhouse
Kitchener · Issued Sep 3, 2026 · 2 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Construction of an uncovered deck with stairs on the rear of a single detached dwelling
Toronto · Issued Sep 3, 2026 · 2 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Replace existing mudroom/back entry with one slightly larger to include a small main…
Toronto · Issued Sep 3, 2026 · 2 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Proposed rear and partial second storey addition, a new full third storey addition,…
Toronto · Issued Sep 3, 2026 · 2 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Proposal to replace front porch with an enclosed one storey mudroom addition.
Toronto · Issued Sep 3, 2026 · 2 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Rear two storey addition and interior renovations.
Toronto · Issued Sep 3, 2026 · 2 months ago
⏱ Likely ready now
Why it’s a lead: Pool installs leave the yard torn up
NEW BACKYARD ANCILLARY STRUCTURE (POOL CABANA)
Toronto · Issued Sep 3, 2026 · 2 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Proposed second floor addition 113.49m², Interior alteration 88.13m², rear deck, and new…
Toronto · Issued Sep 3, 2026 · 2 months ago
⏱ Likely ready now
Why it’s a lead: Landscaping or hardscape mentioned
Proposal to replace existing damaged walk-up-stairs and existing damaged concrete block…
Toronto · Issued Sep 3, 2026 · 2 months ago
⏱ Likely ready now
Why it’s a lead: Pool installs leave the yard torn up
Proposal to construct a new rear-yard deck. A future pool is indicated on the site plan…
Kitchener · Issued Sep 2, 2026 · 2 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Replacing an existing two-story deck with a new two-story deck located at the front of a…
Kitchener · Issued Sep 2, 2026 · 2 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
A roof at the rear of a single detached dwelling
Toronto · Issued Sep 2, 2026 · 2 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
REAR ADDITION TO AN EXISTING 2 STORY DWELLING LENGTH OF UNDERPINNING: 21.0 m AREA OF…
Toronto · Issued Sep 2, 2026 · 2 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Proposed second floor extension above the kitchen at rear side
Toronto · Issued Sep 1, 2026 · 2 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Proposed single storey rear addition to existing dwelling (heated sun room)
Toronto · Issued Sep 1, 2026 · 2 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Proposal for a 2nd floor side addition at the front above existing garage & a 2-storey…
Toronto · Issued Sep 1, 2026 · 2 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Proposal for 3rd floor addition over existing 2 storey section of the house, 3 storey…