Loading permits…
Pick your trade and area. Switch to ⏱ Ready now to see the jobs at the stage you’re needed.
Loading permits…
Permits at the stage when hvac work usually starts.
Neighbourhoods are free. Full addresses are for members.
Permits from the last 9 months show the neighbourhood only. Members get every address, the Ready-now timing for their trade, saved leads and a morning email — $99/month, and if you don’t land a job in 30 days, we refund you.
Updated daily from city open data · 24 addresses locked on this page
Toronto · Issued Oct 2, 2026 · 34 days ago
⏱ Likely ready now
Why it’s a lead: New dwelling needs a full HVAC system
Proposal to demolish existing detached dwelling and construct a 3 storey semi-detached…
Toronto · Issued Oct 2, 2026 · 34 days ago
⏱ Likely ready now
Why it’s a lead: New dwelling needs a full HVAC system
Proposal to convert existing detached garage in rear yard of existing dwelling into a new…
Toronto · Issued Oct 2, 2026 · 34 days ago
⏱ Likely ready now
Why it’s a lead: New dwelling needs a full HVAC system
Proposal to construct a new two-storey garden suite with unfinished basement.See also…
Toronto · Issued Oct 2, 2026 · 34 days ago
⏱ Likely ready now
Why it’s a lead: Additions need HVAC extended to new space
Proposal for 2 storey side addition, balcony, extended roof terrace and interior…
Toronto · Issued Oct 2, 2026 · 34 days ago
⏱ Likely ready now
Why it’s a lead: New dwelling needs a full HVAC system
To construct a 3 storey fourplex. Building, Plumbing, Drainage and HVAC.See also 26…
Toronto · Issued Oct 2, 2026 · 34 days ago
⏱ Likely ready now
Why it’s a lead: New dwelling needs a full HVAC system
Proposal to demolish existing building and construct a new two-storey single-family…
Toronto · Issued Oct 2, 2026 · 34 days ago
⏱ Likely ready now
Why it’s a lead: Additions need HVAC extended to new space
Proposal to alter the existing two-storey detached dwelling by constructing a partial…
Toronto · Issued Oct 2, 2026 · 34 days ago
⏱ Likely ready now
Why it’s a lead: Additions need HVAC extended to new space
Proposed construction of a heated second-floor sunroom over the existing rear portion of…
Waterloo · Issued Oct 2, 2026 · 34 days ago
⏱ Likely ready now
Why it’s a lead: New dwelling needs a full HVAC system
The Emily Modern - 2 storey walk-up single detached dwelling with attached garage.…
Cambridge · Issued Oct 1, 2026 · 35 days ago
⏱ Likely ready now
Why it’s a lead: Additions need HVAC extended to new space
Residential Alteration: Single Detached, addition
Kitchener · Issued Oct 1, 2026 · 35 days ago
⏱ Likely ready now
Why it’s a lead: New dwelling needs a full HVAC system
A new 16-unit rental stacked rowhouse development. (Block I)
Kitchener · Issued Oct 1, 2026 · 35 days ago
⏱ Likely ready now
Why it’s a lead: New dwelling needs a full HVAC system
A new single detached dwelling with one attached additional dwelling unit and an attached…
Kitchener · Issued Oct 1, 2026 · 35 days ago
⏱ Likely ready now
Why it’s a lead: Additions need HVAC extended to new space
An attached roof structure at the rear of a single detached dwelling
Kitchener · Issued Oct 1, 2026 · 35 days ago
⏱ Likely ready now
Why it’s a lead: New dwelling needs a full HVAC system
A new 2 storey detached dwelling, no deck included, unfinished basement w/ 3PC rough in,…
Mississauga · Issued Oct 1, 2026 · 35 days ago
⏱ Likely ready now
Why it’s a lead: HVAC equipment mentioned
Revision to permit 25-9644 basement (only) new furnace
Mississauga · Issued Oct 1, 2026 · 35 days ago
⏱ Likely ready now
Why it’s a lead: Additions need HVAC extended to new space
New addition to second floor above the garage as-built finished basement
Mississauga · Issued Oct 1, 2026 · 35 days ago
⏱ Likely ready now
Why it’s a lead: HVAC equipment mentioned
Revision to permit 25-11328 - new hvac systems installation (2) furnaces
Mississauga · Issued Oct 1, 2026 · 35 days ago
⏱ Likely ready now
Why it’s a lead: Additions need HVAC extended to new space
Residential second unit in basement finished basement area new stairs addition leading…
Toronto · Issued Oct 1, 2026 · 35 days ago
⏱ Likely ready now
Why it’s a lead: Additions need HVAC extended to new space
Proposal to construct partial second-floor addition above existing garage to single…
Toronto · Issued Oct 1, 2026 · 35 days ago
⏱ Likely ready now
Why it’s a lead: Additions need HVAC extended to new space
Proposal for 2 storey rear addition, interior alterations and rear deck.
Toronto · Issued Oct 1, 2026 · 35 days ago
⏱ Likely ready now
Why it’s a lead: New dwelling needs a full HVAC system
Proposal to demolish existing dwelling and construct a new three storey SFD-Detached…
Toronto · Issued Oct 1, 2026 · 35 days ago
⏱ Likely ready now
Why it’s a lead: Additions need HVAC extended to new space
Proposal for interior alterations, new rear first floor addition, rear patio and changes…
Toronto · Issued Oct 1, 2026 · 35 days ago
⏱ Likely ready now
Why it’s a lead: Additions need HVAC extended to new space
Increase the size of the existing second floor unit by adding a third floor addition.
Waterloo · Issued Oct 1, 2026 · 35 days ago
⏱ Likely ready now
Why it’s a lead: New dwelling needs a full HVAC system
The Meera Modern - 2 storey walk-up single detached dwelling with attached garage.…