Loading permits…
Pick your trade and area. Switch to ⏱ Ready now to see the jobs at the stage you’re needed.
Loading permits…
Permits at the stage when landscaping work usually starts.
Neighbourhoods are free. Full addresses are for members.
Permits from the last 9 months show the neighbourhood only. Members get every address, the Ready-now timing for their trade, saved leads and a morning email — $99/month, and if you don’t land a job in 30 days, we refund you.
Updated daily from city open data · 24 addresses locked on this page
Vaughan · Issued Sep 23, 2026 · 42 days ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Renovation and Addition of Existing House CoA-116/25 EP-25 139833 -Addition: 78.78 m2Gr…
Vaughan · Issued Sep 23, 2026 · 42 days ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Interior and exterior alterations and small increase in garage area. addition: 5.28 sqm…
Vaughan · Issued Sep 18, 2026 · 47 days ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
ADDITION TO CREATE A THIRD FLOOR
Vaughan · Issued Aug 26, 2026 · 2 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Addition to the 2nd floor above garage.
Vaughan · Issued Aug 19, 2026 · 3 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Deck. Washroom under deck requires a separate permit as addition. Double payment…
Vaughan · Issued Aug 19, 2026 · 3 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Proposed second floor addition Main House: 02-3318
Vaughan · Issued Aug 17, 2026 · 3 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
- Front addition (5.84m2) - interior alterations, proposed elevator (basement - 189m2,…
Vaughan · Issued Aug 13, 2026 · 3 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Addition and Interior Alteration
Vaughan · Issued Aug 11, 2026 · 3 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Addition and Interior Alteration Including As-Built Basement Finish for Personal Use.…
Vaughan · Issued Aug 4, 2026 · 3 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Addition: ground floor, foyer area(4.36 m2) Interior alteration: all ground floor and…
Vaughan · Issued Jul 31, 2026 · 3 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Proposed 2nd Floor Addition to Existing 2 Storey Dwelling with Basement Finish for…
Vaughan · Issued Jul 28, 2026 · 3 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Rear Covered Porch Addition
Vaughan · Issued Jul 24, 2026 · 3 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Additions to existing single family dwelling ** Ground floor Addition - 157.1 sqm. ,…
Vaughan · Issued Jul 22, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Additions, alterations, decks x3, covered porch x 2 Basement - alteration Ground floor…
Vaughan · Issued Jul 21, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Rear 1 storey addition with covered patio and legalizing finished basement. Addition…
Vaughan · Issued Jul 16, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
We are applying for the interior alteration permit of an addition of a sauna room in the…
Vaughan · Issued Jul 15, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Addition to the side of the existing dwelling
Vaughan · Issued Jul 9, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Construction access wrecks the yard
Garage and second floor addition Main floor 30m2 Second floor 61.3m2
Vaughan · Issued Jul 8, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Pool installs leave the yard torn up
Proposed rear detached Cabana structure adjacent to pool without plumbing.
Vaughan · Issued Jul 2, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: Pool installs leave the yard torn up
2-Storey Custom Single Detached Dwelling Lot Grading permit - 26 104286 EP Pool permit -…
Vaughan · Issued Jul 2, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: New home — builders usually stop at sod
New Subdivision home Finished basement, Walk-out, Front porch, Covered back porch
Vaughan · Issued Jun 29, 2026 · 4 months ago
⏱ Likely ready now
Why it’s a lead: New home — builders usually stop at sod
New Subdivision home SFD with 1 Deck, 1 covered porch. personal use FB - 262.86, 1st…
Vaughan · Issued Jun 19, 2026 · 5 months ago
⏱ Likely ready now
Why it’s a lead: New home — builders usually stop at sod
Proposed 2 storey dwelling built on existing foundation, First flr 325.41sm, second flr…
Vaughan · Issued Jun 18, 2026 · 5 months ago
⏱ Likely ready now
Why it’s a lead: New home — builders usually stop at sod
2-storey new dwelling with integral garage+ finished basement +Walk up bsmnt finished…